Front foundation
Decking on stairs and porch (at top of stairs) is to be replaced within a month.
|
driveway side of house
Looking from the backyard to the street on the driveway side of the house.
|
Carriage House & Garage
Both Buildings together. The are attached.
|
Garage
Two car garage. Doors need new hinges, otherwise, condition is fair.
|
Carriage House - Front
Shingles were covering ivy which has been removed. Shingles are not to be replaced.
|
Back porch foundation forms
Forms for the foundation of the back entrance to the house and to the crawl space.
|
Crawl space
Foundation is complete, and house is bolted to foundation. Siding just needs to be completed.
|